Table of Contents

Hands-on Activities

Check the agenda https://teamup.com/kscub44vaqgwbid5kq?showProfileAndInfo=0&showSidepanel=1&showAgendaHeader=1&showAgendaDetails=0&showYearViewHeader=1

The following is a provisional agenda. Mentors of each group can adjust basing on his/her preference and the group situation

1. Act#1 (2.75h, Mon. Mar.4):

2. Act #2 (1.5h, Tue. Mar.5)

Making the circuit to work with MPPC (group A and C), LED driving with function generator. Observe signal from sensor with various configuration (intensity, frequency, pulse width..)

3. Act #3 (1.75h, Tue. Mar.5):

4. Act #4 (1.75h, Wed. Mar. 6):

5. Act #5 (1.75h, Thu. Mar. 7):

Work in combination of Scintillator, wavelength shifting fiber and photosensor; concept of muon counter; NIM modules to use: discriminator, scaler, coincidence (and delay if needed)

6. Act #6 (2.0h, Thu. Mar. 7):

7. Act #7 (2.75h, Fri. Mar. 8):

Cosmic ray muon data taking and analysis

8. Act #8 (2.75h, Fri. Mar. 8):

Cosmic ray data taking and analysis