teamb2023 [2023/02/26 09:38] – [Hands-on Activities] nuicise | teamb2023 [2023/03/19 22:02] (current) – [Team B] nuicise | ||
---|---|---|---|
Line 11: | Line 11: | ||
* Nguyen Thi Nhung | * Nguyen Thi Nhung | ||
+ | [[https:// | ||
===== Targets ===== | ===== Targets ===== | ||
* **MPPC properties** | * **MPPC properties** | ||
Line 32: | Line 33: | ||
1. Act#1 (1.5h, Feb. 27 AM): safety, lab arrangement, | 1. Act#1 (1.5h, Feb. 27 AM): safety, lab arrangement, | ||
- | 2. Act #2 (1.75h, Feb. 27 PM) oscilloscope, | + | 2. Act #2 (1.75h, Feb. 27 PM) oscilloscope |
- | 3. Act #3 (2.75h, Feb. 28 AM): MPPC circuit; soldering, testing signal, pedestal; noise mitigation with Faraday case | + | 3. Act #3 (2.75h, Feb. 28 AM): Single |
- | 4. Act #4 (2.75h, Feb. 28 PM): Light tightening; MPPC characteristics (noise rate, gain, supply voltage dependence; timing response); measure the speed of light in the optical fibers if having time (concept of light detection and ranging or LiDAR in short); NIM modules to use: disciminator and scaler | + | 4. Act #4 (2.75h, Feb. 28 PM): Start working with MPPC array; measure |
- | 5. Act #5 (2.75h, Mar. 1 AM): Work in combination of Scintillator, | + | 5. Act #5 (2.75h, Mar. 1 AM): Continue with fluorescence lifetime measurement if needed. measure coincidence rate. Work in combination of Scintillator, |
6. Act #6 (2.75h, Mar. 1 PM): Data taking and analysis | 6. Act #6 (2.75h, Mar. 1 PM): Data taking and analysis |